This assignment requires that you adapt the analysis done for Project1/Project3/Project4 (all are attached) to a new environment. Use some of the prior work from the projects such as, the recommendation memo and network diagram, to develop a high-level plan for implementing the required controls, changes, etc. to mitigate vulnerabilities and convergence issues in the new environment. You may need to do additional analysis to address issues specific to the second case study?s environment. Your high-level plan should include all the system development life cycle (SDLC) gates/decision points and all relevant tasks. Describe and relate the implementation solution to CIA and incorporate, people, processes and technology to this plan.
This is a combination of a paper and a detailed list of steps and resources that you would follow to implement and complete this project. Think about all of the actions, resources, and tasks that you would need in order to effect a successful implementation. These should also be included as part of the plan. You can use the Case Study (attached) as a template for the assignment. The minimum structure for this assignment is below:
INTRODUCTION
Purpose of Plan
GOALS AND OBJECTIVES
Business Goals and Objectives
Project Goals and Objectives
SCOPE
Scope Definition
Items Beyond Scope
PROJECTED EXPENSES
System Development Life Cycle/Schedule
Milestones
ASSUMPTIONS
Project Assumptions
CONSTRAINTS
Project Constraints
Critical Project Barriers
The Plan will be a minimum 5 page, double-spaced paper using Times New Roman 12 font and APA style formatting for citations and references. It will also include a minimum of 5 references. The Title/Cover page, illustrations (tables/charts/graphs), network diagram, and references are not part of the page count but are required for the assignment. The grading rubric provides additional details as to what should be included in the paper. Your instructor may provide an APA style template to use for this paper.